Monday June 30, 2008
Today was a day off so rather than try and go back and do every day of last week that I missed, here’s the synopsis:
June 23, 2008: Day 11, CS2: This was station round day. We had 15 minutes at each station to prepare and present the following: saute chicken, saute asparagus, pan fry pork cutlet, pan fry eggplant, grill chicken, deep fry onion rings and bake a potato. Obviously we were practicing all the dry heat methods of cooking. This was one of the funnest days. And everything was done well under the 15 minute time frame.
June 24, 2008: Day 12, CS2: Today we had to roast a cornish game hen and braise chicken Chausseur, which include the sauce. I was scrambling today (not eggs, in the kitchen) and with 30 seconds left, presented my chicken dish. A bit stressed.
June 25, 2008: Day 13, CS2: In the kitchen we had to do braised red cabbage and cauliflower au Gratin. It was an easy day in the kitchen compared to the day before. And we had our egg demo for the next day on how to do all the different methods of egg cookery. When i was done with my cauliflower dish, Chef Winter told me to take it down to Chef Ron in his class. She knows he hates cauliflower so the look on his face was perfect. He did laugh and he actually tried it.
June 26, 2008: Day 14, CS2: Knife cutting final and egg cookery day. To me, the hardest day of the week. Eggs are not the easiest thing to cook that’s for sure! There were eggs everywhere. The overhard was the hardest, then came scrambled, sunnyside up, poached, basted, over easy, and an omelet. I never did get to my overeasy and had to do my omelet in open lab. During the knife final, I was totally in a zone. I was so happy with the way I had turned in my cuts I just knew I had done well.
June 27, 2008: Day 15, CS2: Last day! Found out that morning that I had gotten 59.5 out of 60 on my cutting final. It set the day right. We had our buffet in kitchen that day and each group had to prepare something different. We were in charge of the 40 tournedos of beef, wrapped in bacon with a Bordelaise sauce. Then we plated all of the food and got to enjoy a big meal at 8:30 am! We had our 5 page written final and our product ID final and then we were done! All went well.